loading...
Portofolio

Mikes Palace - reconstruction and restoration works


Mikes Palace is situated on the northern part of Museum square, being one of the noble palaces built in Cluj at the turn of the 18th century. The palace plan is U-shaped, the building has a partial basement, ground floor and floor.

Mikes Palace is one of the typical palaces of late Baroque in Cluj. Mikes Palace had several construction periods, the current research stage showing three main phases: pre baroque, baroque, and eclectic.

From the pre baroque period we have only the western wall of apartment no. 5 in the north-west corner of the palace, which keeps a few traces of voids very different from the gaps of the current northern façade (the Baroque voids have not been changed during the eclectic period). This wall was erected in an unclear period (before 1790) when there were no other buildings in the western neighborhood.

More about the Mikes Palace, , here.
Building destination: old (existing) basement, bar kitchen and restaurant.
  • Newly created basement: technical space:
  • Ground floor: restaurant / bar
  • Top floor / attic: apartments, hotel
The general objective of the project is the rehabilitation of the construction, respectively, in the first phase, the urgent consolidation of the damaged areas / that are in precolapse state. Due to the completely inappropriate state of the building, most of the structural systems being in a badly damaged state, a series of major interventions have taken place, namely:
  • Foundations and land strengthening, by injection, underpinning works..
  • Remediation of cracks and displacements in walls and vaults. Rebuilding arches and vaults. Connecting structural walls. Consolidation and restoration of chimneys.
  • Interventions at the roofing framework level, restoration of structure and roof. Reshaping main supporting structure elements. Strengthening of the supporting structure with metallic fasteners.
  • Removal and repair of tile roofs.
  • Restoration of decorative elements on the facade (window frames, cornices, prophiles, socle)
  • Consolidation and closure of cracks in piles, hollows, arches by injection and application of carbon fiber / glass fiber strips.
  • Closing hollows and creating new ones.
  • Demolition of the old floor and construction of a new one on a metallic structure.
  • Hydraulic lime plastering of arch walls and vaults made of bricks, stone or masonry. Thermosystem plastering.
  • Hydraulic lime plaster finishing for renovation / restoration works.
  • Archeological excavations in the inner courtyard and the gang.
  • Creating a new underground concrete structure inside the old walls.
  • Main façade metal balcony execution.

Images gallery HERE

Sfântul Apostol și Evanghelist MATEI Church


Orthodox traditional church, 32 m long, 10.25 m wide (13.25 m at the side apses), with two towers, a nave and a narthex. The vertical structure is made of masonry on an armed core, with reinforcements in the effort concentration points generated by the towers.

Project and particular architecture elements
  • The church is poker club shaped, has a tower and a bell tower.
  • The church plan is cross shaped, with a narthex, nave, altar and “brâncovenesc”-style porch with cylindrical columns and semicircular arches.
  • Orthodox traditional church, 32 m long, 10.25 m wide (13.25 m at the side apses), with two towers, a nave and a narthex.
  • The entire reinforced concrete structure is thus invisible being "dressed" in the masonry, on both (inner and outer) sides.


The vertical structure is made of masonry on an armed core, with reinforcements in the effort concentration points generated by the towers.
The vertical structure is made of masonry on an armed core, with reinforcements in the effort concentration points generated by the towers. It has a basement in the same configuration with a reinforced concrete floor. The double domes, cupolas and arches are also made of reinforced concrete cast on a masonry formwork with various curved profiles.


Executed works:
  • Exterior plastering
  • Realization of reinforced profile frames on the facade. The frames were template-drawn and painted with lime, like the entire façade.
  • Realization of apparent brick walls in the basement.
  • Underfloor heating / floor screeds

Images gallery HERE

Camino house / Samuil Micu - Complete destination change, rehabilitation and full building reorganization.


Destination of the building after reconstruction: apartments, hotel.

Height regime - Existing basement, existing old body ground floor, 1st floor new body, 2nd floor new body with split levels.

Executed works:
  • Indoor / outdoor plastering. Indoor / outdoor plaster finishing. Indoor / outdoor painting.
  • Brick walls grouting (apparent bricks).
  • Basalt wool façade insulation thermosystem, 10 cm thick. Decorative plastering.
  • Internal space partitioning with plasterboard walls - 5 GK board systems, 4 GK board systems.
  • Plasterboard ceilings.
  • Basalt wool thermal insulation of the attic - plasterboard closure of the inclined ceiling.
  • Cladding works with tiles.
  • Metal ladders. Metal ladders in the stairwell.
  • Ornaments restoration on exterior cornices

Images gallery HERE

Arhimar - Historical monument.


Reconstruction works / rehabilitation and conversion into an office building.

All buildings inside the Citadel are very important and have an exceptional historical value for the modern history of Cluj.
The Austrian fortification was built in the first decades of the 18th century, and played an important role in the history of Cluj until the Revolution of 1848.

The project included rehabilitation and reconstruction works, reconversion of the old military barracks into offices - at the H pavilion of the bastion fortress, plus exterior arrangements

Executed works:
  • Indoor / outdoor plastering. Indoor / outdoor plaster finishing (hydraulic lime materials).
  • Stone walls grouting (apparent stone).
  • Indoor / outdoor painting.
  • Draining plastering on socle base.
  • Outdoor design. Pavements, Corten edging, outer stairs, pavements, green areas.

Images gallery HERE

Civil and industrial construction works.


Blocks of flats and warehouses, dwellings, civil engineering construction and rehabilitation works.

Some examples:
  • Blocks of flats in Cluj Napoca, Buna Ziua neighbourhood
  • Blocks of flats Cluj Napoca, Borhanci neighbourhood
  • Civic Center of Budeşti, Maramureş County
  • Industrial hall - S.C. Agressione Group S.A.
  • Aluniş Community Centre - Municipality of Aluniş
  • VILLE - Chic / fashion store chain
  • Residence, dwelling + swimming pool - S.C. Arcer. S.R.L, Sighetul Marmatiei
  • Special construction for specific events
  • Cluj Napoca – UNTOLD
  • Expansion of the restaurant room and redecorating rooms at Eurosind Hotel - Maramureş Education Free Trade Union - Ocna Şugatag
  • Wooden cottage - Breb

Images gallery HERE